Richland and Lexington County Road Construction Information
January 26, 2015COLUMBIA, SC – Expect delays and nighttime lane closures to widen Interstate 20 from Interstate 77 (MM 74.7) past Spears Creek Church Road (MM 84.6) in Richland County. Completion is anticipated winter 2015.
Expect minor delays, flagging operations and possible nighttime detours on Alpine Road (under I-20) between Faraway Drive and Polo Road in Richland County while ramp intersections are being improved and I-20 bridges are being widened / reconstructed. Completion is anticipated winter 2015.
Expect delays, flagging operations and lane closures on Trenholm Road (S-33) and O’Neil Court (S-1677), in Richland County for signal upgrades and sidewalk work. Completion is anticipated Feb. 28, 2015.
Expect delays, flagging operations and lane closures on Forest Dr. (SC 12) and Trenholm Road (S-33), in Richland County for signal upgrades and sidewalk work. Completion is anticipated Feb. 28, 2015.
Routine nighttime lane closures are expected on I-26 from the I-77/US321 interchange (Mile Marker 115) to S-6/Caw Caw Road. (Mile Marker 136) in both the eastbound and westbound directions. The eastbound and westbound I-26 travel lanes from I-77 (MM 115) to Old Sandy Run Road (MM 125) are now shifted to the right to provide room for temporary concrete barriers and heavy construction in the highway median. The speed limit has been reduced to 60 mph in this area. Dixiana Road beneath I-26 has been closed and local traffic detoured for reconstruction of the I-26 Bridge over CSX RR and Dixiana Road. Interstate milling and paving is underway between MP 125 and MP 135, eastbound and westbound. The eastbound and westbound rest areas near MM 122 are closed for the duration of this project. The anticipated completion date for this project is September 2015.
Expect delays, flagging operations and lane closures on St. Andrews Road (S-36) and Kay St (S-2016), in Lexington County for signal upgrades and sidewalk work. Completion is anticipated Jan. 31, 2015.
Expect delays, flagging operations and lane closures on St. Andrews Road (S-36) and Sidney Rd (S-173), in Lexington County for signal upgrades and sidewalk work. Completion is anticipated Jan. 31, 2015.
Expect delays, flagging operations and lane closures on St. Andrews Road (S-36) and Jamil Rd (S-1791), in Lexington County for signal upgrades and sidewalk work. Completion is anticipated Feb. 27, 2015.
Expect delays, flagging operations and lane closures on St. Andrews Road (S-36) and I-26 Eastbound Ramp, in Lexington County for signal upgrades and sidewalk work. Completion is anticipated Feb. 27, 2015.
Expect delays, flagging operations and lane closures on Rimer Pond Road (S-1041) in Richland County for widening and resurfacing. Anticipated completion date is January 2015.
Expect delays, flagging operations and lane closures along US-1 (Augusta Highway) from Schofield Road (S-1849) to Old Field Road (S-31) in Lexington County. Anticipated widening construction along US-1 in this area will be completed December 2015.
Expect minor delays, lane closures, and flagging operations along US 321 @ S-32-663 (Wood Trail Drive) for construction associated with intersection improvement. Completion is anticipated Spring 2015.
Expect minor delays, flagging operations, and lane closures along US 1 (Meeting St.) between State St. and Leaphart St. in Lexington County. Anticipated completion date is Jan. 31, 2015.
Expect minor delays, flagging operations, and lane closures along Leaphart St. between US 1 (Meeting St.) and Shull St. in Lexington County. Anticipated completion date is Jan. 31, 2015.